Verify OTP
Enter the 6-digit code sent to your mobile
Demo OTP: 123456
← Cancel
Reset Password
Reset via mobile OTP or email link.
Create New Project
Set up a new steel control project.
Edit Project
Update project details.
New Purchase Order
Create a real purchase order for this project.
Vendors
Your company's steel suppliers.
Add New Vendor
Record Delivery
Add Structure Element
Add an element to the project hierarchy.
Edit BBS Row
All parameters. Weight auto-calculated: D²/162 × Length × Qty (IS 2502).
Total Nos
—
Total Length
—
Unit Wt (kg/m)
—
Total Weight
—
Formula: Wt = (D² ÷ 162) × Total Length  |  IS 2502
PM Authorization — Unlock Steel Issue
This unlock is permanently logged in the audit trail. Provide full justification.
Log Steel Issue Entry
Record daily steel issue from yard to site.
Auto Deviation: — ⚠️ Exceeds threshold — will be flagged
Upload Structural Drawing
PDF · DWG · DXF · PNG · JPG · TIFF  |  Max 50 MB  |  Stored locally — never leaves your server.
Drop drawing here or click to browse
PDF · DWG · DXF · PNG · JPG · TIFF  |  Max 50 MB
Local · SHA-256 verified
🤖 AI Bar Extraction Pipeline Local only
Edit Project
Open Project
Structure
BBS Editor
Reconciliation
Upload Drawing
Pre-Tender
Reports
Archive Project
Notifications Mark all read
Metro Viaduct — Steel wastage exceeded 2% on 16mm.
2 min ago
Airport TW-A — Drawing extraction complete. 124 bars at 94%.
18 min ago
BBS Rev R-3 saved for Tower Block-D by Suresh Patel.
1 hour ago
View all notifications →